
Weifang High Speed Railway North Station and station square cover an area of 100,958.5 square meters, in which the station square development connects the subway station hall and surrounding buildings, introduces commercial formats, fully integrates into the city public facilities, forming the station square area, parent-child activity area, cultural display area, fashion retail area, life service area and fitness activity area six theme areas. In the future, transportation hubs will become vibrant urban centers, carrying rich urban life and gathering diverse urban functions.

The BAS system design of the station front square is designed for 3 chiller units, 4 freezing/cooling/hot water pumps, 4 cooling towers, 22 air conditioning units of the HVAC system, 2 fresh air units, 74 air supply and exhaust fans, 26 collection Wells of the water supply and drainage system and 27 carbon dioxide sensors of the air environment of the underground space. 45 carbon monoxide sensors and other equipment for monitoring.
The BAS system in front of the station square is designed to monitor about 2000 points, and uses about 210 controllers and modules of MEK-i brand KXM-22P and KXM-IP0080. The system adopts DDC controller based on all-IP architecture, and the communication between the upper system and DDC is conducted through BacnetIP protocol. The system communication link based on TCP/IP network is more efficient and stable than the traditional 485 bus system, and the subsequent system maintenance and expansion are more convenient.